A. actions of operator
B. layout of work place
C. tooling and equipment
D. all of the above
E. none of the above
Advertisement
Related Mcqs:
- Motion study is used for________________?
- Choose the wrong statement? A. improving a work method B. improvising a work method C. designing a work method D. providing a schematic framework E. reducing inventory costs...
- Basic motion time study gives times for basic motions in ten thousandths of_______________?
- A. second B. minute C. hour D. day E. none of the above...
- Micro motion study is__________________?
- A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view B. motion study* observed on enhanced time intervals C. motion study of a sequence of operations conducted systematically D. study of man and machine conducted simultaneously E. scientific, analytically procedure for determining optimum work...
- Micromotion study involves following number of fundamental hand motions_______________?
- A. 8 B. 12 C. 16 D. 20 E. 24...
- PMTP (predetermined motion time systems) include___________________?
- A. MTM (method time measurement) B. WFS (work factor systems) C. BNTS (basic motion time study) D. all of the above E. none of the above...
- Queuing theory deals with problems of________________?
- A. material handling B. reducing the waiting time or idle Jajme C. better utilization of man services D. effective use of machines E. none of the above....
- The technique of value analysis can be applied to____________________?
- A. complicated items only B. simple items only C. crash programmer items only D. cost consciousness items only E. any item...
- The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
- A. early finish B. early start C. late start D. late finish E. none of the above...
- In PERT analysis, critical path is obtained by joining events having___________________?
- A. +ve slack B. -ve slack C. zero sldck D. dummy activities E. critical activities...
- PERT analysis is based on____________________?
- A. optimistic time B. pessimistic time C. most likely time D. all of the above E. none of the above...